It’s another beautiful (but chilly) day at Royal Recognition! This week, crews created the framework for our new loading dock — digging out what will soon become an additional loading bay, carving out a section of the ground large enough for trucks to back into, framing the garage door sized hole in with cinder block and more.

Construction equipment chips away at the soil next to the building while crews make sure the ground stays level.

Heavy duty construction equipment chips away at the soil next to the building while crews make sure the ground stays on the correct decline.

It’s fascinating to watch the changes taking place each day, including what is going on inside the warehouse. The workers have built an entire insulated enclosure (which you can see in the photo above) to protect against the elements during the brisk Wisconsin winters. The wood planks are used as “doors” when crews are done working for the day.

DSC08424_2

Alternate photo of additional loading bay. Extra equipment sits behind machinery ready for use.

Next week, additional blacktop will be torn up and gravel laid to make way for the sloped concrete loading bay. Watch for more photos next week!